Gardon Self-Priming Jet Deep Well Pump with Pump Impeller
-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Fujian
-
Validity to:
Long-term effective
-
Last update:
2017-12-19 07:23
-
Browse the number:
52
+
- Contactaixin:
Miss Rita(Mr.)
- Email: telephone: phone:
-
Arrea:
Fujian
Address:Muyang She Minority Industry Zone, Fuan City, Ningde, Fujian, China 355000
- Website:
+
Pump
>> Pump Body: cast iron & support under special anti-rust treatment
>> Impeller: stainless steel impeller, brass impeller, ppo impeller
>> Mechnical Seal: carbon / ceramic / Stainless Steel
Motor
>> Bulit-in thermal protector for single phase motor
>> Motor with copper winding
>> Motor Housing: Steel-plate, Aluminum alloy
>> C&U bearing
>> AISI 304 shaft or 45# carbon steel
Working Range
>> Liquid: clean liquids without suspended solids, non-aggressive
>> Liquid temperature: -10ºC and +100ºC
>> Ambient temperature up to +40ºC
>> Max. working pressure 10 bar
>> Continous service S1
>> Insulation: B
>> Protection: IP44
Application
>> Household Water Supply
>> Water Supply System
>> Cooling System
>> Boost System
FCP Jet Deep Well Structure
Item | Description | Material | Item | Description | Material | Item | Description | Material | Item | Description | Material | Item | Description | Material |
1 | Plug | Brass H59 | 7 | Key | SS420 | 13 | Terminal Block | ABS | 19 | Spring Ring | 65Mn | 25 | O ring | NBR |
2 | Washer | NBR | 8 | Impeller | Brass H59 | 14 | Capacity | CBB60 | 20 | Fan Cover | A3 | 26 | Cover | ABS |
3 | Fliter | ABS | 9 | Screw | A3 | 15 | Screw | Steel-A3 | 21 | End Cover | AL-ZL102 | 27 | Nut | H59 |
4 | O ring | NBR | 10 | M.Seal | SS304&NBR | 16 | Rotor | 22 | Foot | 28 | Diffuser | ABS | ||
5 | Cover | Plastic | 11 | Drop Guard | NBR | 17 | Bearing | 23 | Stator | 29 | O ring | NBR | ||
6 | Screw | 12 | Terminal Cover | ABS | 18 | Fan | ABS | 24 | End Cover | AL-ZL102 | Pump Body | ABS |
Production Work-flow Chart of Pump
About Us
FAQ
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.